Factory Site - Pallavaram

Industrial

Pallavaram, Pallavaram, Chengalpattu

Plot Area 4,800 sq.m
Road Width 15.0m
Dimensions 60.0 × 80.0m
Type Regular
Units
Explain
2.000
Achievable FSI
9,600 sq.m
Max Built-up Area
About 7,680 sq.m usable (80%, a practical estimate)
19.5 m
Max Height
S+3/G+2
Floors

Planning Permission & Building Permit

Planning Permission CMDA
Chennai Metropolitan Development Authority
Issues Planning Permission for land use, FSI, setbacks within CMA
Building Permit Local
The local body (panchayat, municipality or corporation)
G.O.(Ms) No.180 of 2026 delegates residential and commercial buildings only, so for an industrial building confirm with CMDA whether planning permission is needed before the local body issues the permit. Outside Chennai the local body approves residential buildings up to 1,500 sq.m (16,140 sq.ft) of FSI area and 16 dwelling units in a corporation or municipality, or 1,200 sq.m (12,912 sq.ft) of FSI area and 12 dwelling units in a town panchayat or village panchayat, and commercial buildings up to 500 sq.m (5,380 sq.ft), all within 14m and Stilt + 3 or Ground + 2 floors.
Area Type Urban
Building Category Standard (≤19.5m)

Building Classification

Industrial Building
Its planning parameters come from TNCDBR 2019 Rule 36 because:
Industrial use
Your value: Green category | Threshold: Height up to 19.50m
TNCDBR 2019 Rule 36, as substituted by G.O. Ms. No. 154 (2025) and amended by G.O. (Ms) No. 194 (2026)
Relaxations That Apply
CC Exemption

Industrial buildings of every type are outside the Completion Certificate requirement for service connections.

TNCDBR 2019 Rule 20(1)

Mandatory Infrastructure Requirements

Electrical Room & Transformer Yard Required
Dedicated electrical room with transformer yard required on ground floor or open space
Threshold: 900 sq.m (9,687 sq.ft) | Your value: 9600 sq.m (103,334 sq.ft)
  • Location: Ground floor or designated open space
  • Purpose: Accommodate electrical transformer as per TANGEDCO standards
  • Must provide adequate ventilation and access for maintenance
  • Minimum clearances as per TNEB/TANGEDCO guidelines
TNCDBR 2019 Rule 35(11) / Rule 46, Page 52
Source: G.O.(Ms) No.180, H&UD, 08.10.2026 (powers delegated to local bodies, except Chennai); TNCDBR 2019 Rule 5

Third-Party Certification Route

Available for a smaller building

The largest building scoped here (9,600 sq.m, 19.5m) is beyond the route's limits. A building within 2,500 sq.m of FSI area, 18.3m, white or green category in an approved industrial layout on this plot could use it.

The applicant and the Third Party must confirm
  • In an industrial layout developed by SIPCOT, SIDCO or ELCOT, or another approved industrial layout
  • Not in a Coastal Regulation Zone, a hill area notified by the Hill Area Conservation Authority, an Annexure XVII prohibited or restricted area, or an ecologically sensitive area (this plot is near a defence establishment; whether it falls in the restricted area depends on the distance the authority applies)
  • Not in a street alignment, road widening, road or public purpose reservation of the Master Plan, New Town Development Plan, Detailed Development Plan or Grid of Roads plan
  • No litigation pending on the plot

The owner, leaseholder or power of attorney holder applies online on the Tamil Nadu Single Window Portal for Planning Permission with a registered architect (Council of Architecture) or a Grade I engineer as the Third Party. They jointly certify the documents (geo-tagged site photographs, the sale deed, the patta or Town Survey Land Register, the approved or regularised layout or the pre-20.10.2016 deed, and a plan in .dxf or .dwg that passes the online scrutiny). On payment the approved plan and proceedings with a QR code are issued at once. The permit is valid five years and may be extended once by three years. At least 10% of these permits are picked at random each month for verification, and false certification is liable to revocation under sections 56 and 57 of the Town and Country Planning Act and prosecution under section 236 of the Bharatiya Nyaya Sanhita, 2023.

Source: TNCDBR 2019 Rule 2(105-D) to (105-F), Rule 6(1-B), Annexure XXVIII, inserted by G.O. (Ms) No. 179, H&UD, 07.10.2026

Property Location & Zone Overlays

Zone Overlays

Plot Dimensions (Your Input)

Side A (Front) 60.0m ROAD 15.0m
Side B (Right) 80.0m
Side C (Back) 60.0m
Side D (Left) 80.0m
Plot Area (Calculated) 4,800.00 sq.m
Frontage 60.0m
Depth 80.0m

Area = ((Side A + Side C) ÷ 2) × ((Side B + Side D) ÷ 2) = ((60.0 + 60.0) ÷ 2) × ((80.0 + 80.0) ÷ 2) = 4,800.00 sq.m

Required Setbacks

Front (A) (Road) 3.0m
Left (D) 2.0m
Right (B) 2.0m
Back (C) 2.0m

Plot and Setbacks as a Drawing

Take the plot, its roads, the setback line and each scenario's building into CAD or Google Earth. Every part sits on its own layer, in metres, with the building heights set, so the drawing starts from this report's figures.

DXF for CADAutoCAD, BricsCAD, LibreCAD or QGIS
KML for Google EarthNeeds the plot's place on the ground

This plot was entered as side lengths, which gives its shape but not where it lies or which way is north, so a map file would only be a guess. A KML is offered when the plot is read from a KML, KMZ or GeoJSON file at the plot step.

High-Rise Feasibility (>19.5m)

Not Eligible for High-Rise

Restriction: Industrial buildings are limited to 19.50m (Rule 36, G.O. 154 of 2025, G.O. 194 of 2026)

Road Width: 15m Minimum 12m required
Frontage: 60.0m Minimum 29m required
Depth: 80.0m Minimum 29m required

Planning Notes

  • CCTV: one camera for every 300 sq.m of floor area where more than 100 people are employed (Annexure XXI), within an urban local body
  • Consent to Establish before building and Consent to Operate before starting, from the Tamil Nadu Pollution Control Board (Water and Air Acts); an Environmental Clearance as well only where the EIA Notification, 2006 lists the activity

Plot Sketch

Plot Setback Buildable

Plot Visualization

Plot Boundary
Setback Area
Buildable Area
Road

Parking Requirements (TNCDBR 2019)

Vehicle Type Required Spaces Area Required
Car Parking 13 spaces 163 sq.m
Two-Wheeler 103 spaces 185 sq.m
Cycle Parking 103 spaces 77 sq.m
Lorry/Truck Parking 11 spaces 385 sq.m
Total Parking Area Required Stall + 40% circulation 1,134 sq.m

Calculation: Manufacturing: 1 car per 150 sqm office, 1 TW per 75 sqm workshop, 1 cycle per 75 sqm workshop, 1 lorry per 750 sqm (G.O. 225/2024) (G.O. Ms. No. 225 (2024), Industrial Parking Table)

Loading Bay Required: Industrial buildings with workshop/manufacturing areas must provide a dedicated loading/unloading bay.

Environmental & Statutory Requirements

OSR (Open Space Reservation)

Required - 480 sq.m

Rainwater Harvesting

Required

Band (b) of Annexure XXII: Industrial building. Roof water led through a first flush cum pebble-sand filter (or a special filter) to a sump for use, the overflow diverted to the source well if the plot has one, otherwise to recharge wells.

Rooftop Solar (PV)

Not Required

Solar power recommended but not mandatory

Sewage Treatment Plant

Not Required

Below the STP thresholds; connect to the public sewer, or where there is none provide a septic tank with up-flow filter (Rule 35(15)(b))

Completion Certificate

Not required for service connections

Industrial building, Rule 20(1)

Comprehensive Zone & Overlay Analysis

Infrastructure Availability

CMWSSB Metrowater CMWSSB connection not available. Alternative source required. (nearest 3.4km)
CMWSSB Sewage Sewage connection not available. STP may be required. (nearest 4.9km)
High Tension (HT) Line Safe distance from high tension lines. (nearest: 13.0m)

Zoning & Planning Areas

Land Use Zoning Land Use Zone: Industrial
Continuous Building Area (CBA) Standard setback rules apply as per TNCDBR 2019.
Transit Oriented Development (TOD) Not within 500m of a Metro Rail, MRTS or suburban rail corridor (Rule 30(5)). (nearest: 1.7km)
Hill Area Conservation (HACA) Property is outside Hill Area Conservation boundary.
Wetland/Swamp Zone Property is outside protected wetland zones.

Environmental Overlays

Aquifer Recharge Zone No aquifer recharge restrictions apply.
Redhills Catchment Property is outside reservoir catchment area.
Coastal Regulation Zone (CRZ) Property is outside Coastal Regulation Zone.
Eco-Sensitive Zone Property is outside eco-sensitive buffer zones.
Ramsar Site Property is outside Ramsar site buffer.

Height Restrictions

Airport Height Restriction Airport zone with 45m height limit. Your building (19.5m) is within the limit.

Proximity & Hazard Checks

Railway Proximity Adequate distance from railway boundary. (nearest: 209.0m)
Metro Rail Proximity No metro alignment restrictions apply. (nearest: 1.7km)
Water Body/Canal Adequate distance from mapped water bodies. Minor channels/vaikkals may not be in the official layer. (nearest: 672.0m)
Quarry Proximity Safe distance from quarry operations. (nearest: 2.1km)
Burial Ground Adequate distance from burial grounds. (nearest: 2.8km)
Road Widening No road widening proposals affect this property.
Flood Inundation The state flood map marks this ground as inundated. It records no date or depth, so ask neighbours how high past floods came before fixing the plinth level.

Heritage & Cultural

ASI Monuments Property is outside ASI monument protection zones.

Industry & Pollution

Industry Zone Property is NOT in a designated industrial zone. Industrial development may require zone verification or Change of Land Use.

NOCs & Clearances Required (TNCDBR 2019)

2 Required 1 Likely 3 Verify
Fire & Safety 1
Fire NOC
Directorate of Fire & Rescue Services
Condition: Industries & Warehouses
Why: Industrial building (green category)
TNCDBR 2019 Annexure XXIII
Aviation & Defence 1
IAF NOC
Indian Air Force (IAF)
Condition: Within IAF/Defence zone
Why: Property is in Air Force Station (Chennai) caution zone (height restrictions apply)
IAF Air Force Station zone boundary
Environmental & Coastal 1
TNPCB NOC
Tamil Nadu Pollution Control Board
Condition: Industrial/Healthcare/Large Commercial (STP required)
Why: Industrial building (green category)
Water (Prevention & Control of Pollution) Act 1974, Air Act 1981, TNCDBR 2019 Annexure VII/VIII

Manual Verification Required: Some NOCs require verification based on actual property documents and local conditions. Consult with local authorities for definitive requirements.

Disclaimer: This analysis is based on TNCDBR 2019 with its amendments up to G.O. (Ms) No. 194 of 26.10.2026, and government planning parameters. Actual approvals depend on site-specific conditions and local authority requirements. Consult a registered architect or town planner for project-specific advice. For expert guidance on building approvals and compliance, click here.

Location-based checks (HT lines, water bodies, CRZ, airport, eco-sensitive zones, etc.) are computed from the property's mapped coordinate against third-party and government GIS data, so the distances and zone boundaries shown are indicative. Confirm critical findings on-site or with the concerned department.
From report to drawings

Want this built? Talk to us on WhatsApp.

Fast professional designs, planning approvals, the permits and NOCs this report lists, and more, from the team behind LandLens. Message +91 99961 29996 with your report reference VRE-BS-99999 and we pick it up from here.

WhatsApp +91 99961 29996 Usually answered within the hour, 9 am to 9 pm