Property Location & Zone Overlays
Zone Overlays
Plot Dimensions (Your Input)
Area = ((Side A + Side C) ÷ 2) × ((Side B + Side D) ÷ 2) = ((50.0 + 50.0) ÷ 2) × ((70.0 + 70.0) ÷ 2) = 3,500.00 sq.m
Required Setbacks
Plot and Setbacks as a Drawing
Take the plot, its roads, the setback line and each scenario's building into CAD or Google Earth. Every part sits on its own layer, in metres, with the building heights set, so the drawing starts from this report's figures.
This plot was entered as side lengths, which gives its shape but not where it lies or which way is north, so a map file would only be a guess. A KML is offered when the plot is read from a KML, KMZ or GeoJSON file at the plot step.
High-Rise Feasibility (>19.5m)
Eligible for High-Rise Development
All requirements met for buildings above 19.5m height
Planning Notes
- Barrier-free access for the differently abled, the elderly and children (Rule 43, which Rule 37 applies to every institutional building)
- Corridors and verandahs at least 2.0m wide (Rule 42)
- Classrooms: headroom at least 3.0m, and at least 2 doors and 2 windows each (Annexure XV)
- Staircases: at least 1.6m wide with a 1.6m mid-landing, one for every 6 classrooms, continuous to the terrace, no more than 22.6m to reach from any part of an upper floor, and a ground-floor exit at least 2m wide and 2.1m high opening to open space (Annexure XV)
- Terrace parapet at least 1.0m high and 23cm thick (Annexure XV)
- A kitchen in the school premises must not be close to the classrooms or the student toilets (Annexure XV)
- Number of floors: as the National Building Code 2016 provides (Annexure XV item 2)
- Site: not adjacent to a water body, and not close to garbage dumps, dusty or noisy roads or factories (Annexure XV item 1, as amended by G.O. 16 of 2020)
- On a National or State Highway: no direct opening unless a service road exists; otherwise a 7m service road along the frontage, at most two gates 9m to 12m wide, and a 1m guard rail on the median (Annexure XV item 1(a), as substituted by G.O. 173 of 2025)
- A swimming pool, if any: rectangular, in-ground, of the sizes Annexure XX fixes (50m x 25m, 25m x 16m, 15m x 10m or 10m x 6m), with no diving board (Annexure XX)
- CCTV: one camera for every 300 sq.m of floor area if this is a higher secondary school (Annexure XXI), within an urban local body
- Security deposit: 50% of the infrastructure and amenity charges, refundable without interest, returned when the building is completed as approved (Rule 37 J)
- A high-rise is possible here (Rule 39), but on a road of 12m it allows FSI 2.0, no more than the building of up to 19.50m, so that building is planned
Plot Sketch
Parking Requirements (TNCDBR 2019)
| Vehicle Type | Required Spaces | Area Required |
|---|---|---|
| Car Parking | 42 spaces | 525 sq.m |
| Two-Wheeler | 84 spaces | 151 sq.m |
| Cycle Parking | 420 spaces | 378 sq.m |
| Total Parking Area Required | 42 cars, 84 TW , 420 cycles | 1,054 sq.m |
Calculation: Private Schools: 1 car per 100 sqm, of which 21 in the front area for drop-off, + 1 TW per 50 sqm + 1 cycle per 10 sqm classroom
School Building Specifications (Annexure XV)
Sanitation Requirements (Annexure X)
Boys / Girls (50:50)
1167 / 1167
Adjust slider to recalculate fixture requirements in real-time.
| Fixture | Ratio | Required |
|---|---|---|
| WC (Boys) | 1 per 40 boys | 30 |
| WC (Girls) | 1 per 25 girls | 47 |
| Urinals (Boys) | 1 per 20 boys | 59 |
| Wash Basins (Boys) | 1 per 40 boys | 30 |
| Wash Basins (Girls) | 1 per 40 girls | 30 |
| Drinking Water Fountains | 1 per 50 students | 47 |
| Ablution Taps | 1 per WC | 77 |
Environmental & Statutory Requirements
OSR (Open Space Reservation)
Required - 350 sq.m
Rainwater Harvesting
Required
Band (b) of Annexure XXII: Institutional building. Roof water led through a first flush cum pebble-sand filter (or a special filter) to a sump for use, the overflow diverted to the source well if the plot has one, otherwise to recharge wells.
Rooftop Solar (PV)
Not Required
Solar power recommended but not mandatory
Sewage Treatment Plant
Not Required
Below the STP thresholds; connect to the public sewer, or where there is none provide a septic tank with up-flow filter (Rule 35(15)(b))
Completion Certificate
Required before Electricity Connection
Comprehensive Zone & Overlay Analysis
NOCs & Clearances Required (TNCDBR 2019)
- Patta/Chitta in applicant name
- Not government poromboke land
- Not under land acquisition proceedings
- Not affected by flood notification
- Not under Land Ceiling Act
- Original ownership documents verified
- Court cases pending on property (if any)
- Title disputes resolved
- Encumbrance issues cleared
Manual Verification Required: Some NOCs require verification based on actual property documents and local conditions. Consult with local authorities for definitive requirements.
Location-based checks (HT lines, water bodies, CRZ, airport, eco-sensitive zones, etc.) are computed from the property's mapped coordinate against third-party and government GIS data, so the distances and zone boundaries shown are indicative. Confirm critical findings on-site or with the concerned department.