Railway · Tiruvallur

Railway Siding for OPG Power Generation land acquisition: villages and survey numbers

The Tamil Nadu Government has issued one notification to acquire land for the Railway Siding for OPG Power Generation under the Tamil Nadu Acquisition of Land for Industrial Purposes Act, 1997. It covers 105 survey numbers in two villages, Chinnaobulapuram (78) and Pethikuppam (27), both in Gummidipoondi taluk of Tiruvallur district. The notification is dated 25 August 2026 and has not been withdrawn.

Gazette notices
1
Villages
2
Survey numbers
105
Districts
1
First notice
25 Aug 2026
Latest notice
25 Aug 2026

Read from the gazette schedules. Updated .

What land is being acquired and where

The land is being acquired for a railway siding connected with OPG Power Generation. A railway siding is a short rail line that links a facility to the main railway network.

The acquisition covers 105 survey numbers spread over two villages. Both villages are in Gummidipoondi taluk of Tiruvallur district.

The acquisition is being made under a Tamil Nadu state law, the Tamil Nadu Acquisition of Land for Industrial Purposes Act, 1997. The notification was published in the state gazette.

The notice and its present stage

One notification has been issued for this project. It is dated 25 August 2026 and covers both villages. No later notification correcting it has been recorded, and it has not been withdrawn, either fully or for any survey number.

Under the 1997 Act, the main step is a notice published by the Government under section 3(1), stating that the land is required for an industrial purpose. Before such a notice is published, the Act requires that owners and other interested persons be given an opportunity to show cause against the acquisition.

Once a notice under section 3(1) is published, the Act provides that the land vests in the Government free from encumbrances. After that, the remaining steps concern taking possession and settling compensation. Owners should read the gazette copy to confirm the exact section under which the notification of 25 August 2026 was issued.

Compensation under this Act is determined by the authority named under the Act, by agreement with the owner where possible, and the Act provides a route for owners who do not accept the amount. No compensation figures are part of the published record summarised here. Confirm the amount, and the stage of payment, with the Land Acquisition Officer at the Tiruvallur Collectorate.

Villages covered

Chinnaobulapuram, Gummidipoondi taluk, Tiruvallur district: 78 survey numbers.

Pethikuppam, Gummidipoondi taluk, Tiruvallur district: 27 survey numbers.

These are the only two villages in the notification. No survey numbers in either village have been withdrawn.

What to do if your land is listed

Check the gazette notification itself, not only a summary. Match your survey number and subdivision number exactly, and note the extent shown against it.

Compare the extent in the notification with your patta and the village records. If the extent or the ownership shown is wrong, raise it in writing with the Land Acquisition Officer and keep a copy with the acknowledgement.

Keep your title documents, patta, chitta, adangal and encumbrance certificate ready. These will be needed when compensation is assessed and paid.

If you are buying land in Chinnaobulapuram or Pethikuppam, check every survey number against the notification before paying any advance. Land covered by a notice under this Act may already vest in the Government, and a private sale will not give you good title to it.

Villages and survey numbers

Each village with the survey numbers its notices name. A survey number that a later notice withdrew is marked. Sub-divisions created by the acquisition may not be on the land records yet, so a notice often names the parent survey.

Tiruvallur district 2 villages

  • Chinnaobulapuram Gummidipoondi taluk · 78 survey numbers

    6/16/2A6/2B6/2B16/2B26/2B36/2B46/2B5A6/2B5A26/2B5B6/2B86/2B14A10/210/310/410/510/610/7A10/7B10/810/910/1010/1110/1210/1310/14A10/14B10/1510/16A10/16B10/1719/2B319/2B420/2B220/3A20/3B20/7A220/7A320/7A421/2G121/3A121/3B21/3C21/4A221/4C24/250/050/250/3A250/1050/14B51/051/1051/1651/1752/052/1C252/1C452/2A152/2B52/2C52/352/453/053/2D53/553/654/054/2A254/2B54/2C55/257/1A57/1B58/458/6A159/24A59/24B

  • Pethikuppam Gummidipoondi taluk · 27 survey numbers

    156/0156/1C156/1D157/0157/3A157/3B157/5157/9165/1B169/0169/1A169/1C169/1D169/3A169/4169/5A1169/5A2169/5B170/1B170/2170/3170/4A170/4B170/5170/6A170/6B170/8

Gazette notices, oldest first

  1. Notice of intention

    Tamil Nadu Government Gazette, issue 358 of 2026. Under the Tamil Nadu Acquisition of Land for Industrial Purposes Act, 1997. 2 villages: Chinnaobulapuram, Pethikuppam.

    Read the notice (PDF)

What a notice means for a buyer or an owner

A gazette notice records that the government intends to acquire the land, or, for a national highway, a section 3D declaration that the land now vests in the Central Government. A notice is not proof that the acquisition was completed: schedules are corrected and sometimes withdrawn, and a notice can lapse. Before paying an advance on land in these villages, check the exact survey number and confirm the current position with the Special District Revenue Officer (Land Acquisition) for the district.

Check a survey number

Questions people ask about Railway Siding for OPG Power Generation

Which villages are affected by the Railway Siding for OPG Power Generation land acquisition?

Two villages are affected: Chinnaobulapuram and Pethikuppam. Both are in Gummidipoondi taluk of Tiruvallur district. Chinnaobulapuram has 78 survey numbers in the notification and Pethikuppam has 27.

How many survey numbers are being acquired for the OPG railway siding?

A total of 105 survey numbers are covered across the two villages. None of them has been withdrawn so far. Check the gazette copy for the subdivision numbers and extents against each survey number.

Under which law is the land being acquired?

The land is being acquired under the Tamil Nadu Acquisition of Land for Industrial Purposes Act, 1997. This is a state law, and the notification was published in the Tamil Nadu state gazette. It is not an acquisition under the National Highways Act or the 2013 central Act.

What is the current status of the acquisition?

One notification was issued on 25 August 2026, and it has not been withdrawn or corrected. Under the 1997 Act, publication of a notice under section 3(1) vests the land in the Government, after which possession and compensation follow. For the present stage of possession and payment, enquire with the Land Acquisition Officer at the Tiruvallur Collectorate.

How much compensation will landowners get?

No compensation amount appears in the published record summarised here. Under the Act, compensation is fixed by the designated authority, by agreement where possible, and an owner who disputes the amount has a remedy under the Act. Confirm the amount and the basis of assessment with the Land Acquisition Officer, Tiruvallur.

Other acquisitions in Tiruvallur

All land acquisition projects in Tamil Nadu

Source: the schedules of the 1 notice above, published in the Tamil Nadu Government Gazette (Extraordinary). Our reading is partial, so a survey number missing here is not proof the land is free. Data also as JSON.