LandLens Home
Land Lens

Welcome Back

Sign in to continue to dashboard

By continuing, you agree to our Terms, Privacy Policy & Refund Policy

State road · Tiruvallur

Road Over Bridge at Level Crossing 14 near Veppampattu land acquisition: villages and survey numbers

Land is being acquired for the Road Over Bridge at Level Crossing 14 near Veppampattu, a state road project in Tiruvallur taluk, Tiruvallur district, under the Tamil Nadu Highways Act, 2001. The records show 2 notices, both errata published in the state gazette in January 2023 and July 2023, covering 32 survey numbers in 1 village, Veppampattu_87. None of these notices has been withdrawn.

Gazette notices
2
Villages
1
Survey numbers
32
Districts
1
First notice
23 Jan 2023
Latest notice
7 Jul 2023

Read from the gazette schedules. Updated .

What land is being acquired and where

The project is a Road Over Bridge at Level Crossing 14 near Veppampattu. It is classified as a state road project, so the acquisition is handled by the State Government and not under national highway law.

The land lies in Tiruvallur taluk of Tiruvallur district. The notices cover 32 survey numbers, all in a single village, Veppampattu_87.

The notices identify land by survey number and subdivision. If your property falls in this village, compare your patta and Field Measurement Book sketch with the survey numbers printed in the gazette.

The notices and their stage

Both notices were issued under the Tamil Nadu Highways Act, 2001 and published in the state gazette. The first is dated January 2023 and the latest is dated July 2023.

Both notices are errata. An erratum corrects mistakes in an earlier acquisition notification, such as a wrong survey number, subdivision, extent or classification. It does not start a fresh acquisition by itself; it amends a notification that was already issued.

Under the Highways Act, the main notice states the Government's intention to acquire specified land for a highway purpose. Once that notice is published, the acquisition process for the listed land is under way, and owners may raise objections and claims before the authority within the period stated in the notice.

Neither errata notice has been withdrawn, and neither was corrected again later according to these records. The original notification that these errata correct is not part of this set of records, so its date and contents should be checked separately in the gazette.

These records do not show whether compensation has been awarded or paid, or whether possession has been taken. Those points must be confirmed with the land acquisition officer for the project.

Village covered by the notices

Only one village appears in the notices: Veppampattu_87, in Tiruvallur taluk, Tiruvallur district. All 32 survey numbers are in this village.

No survey numbers in this village have been withdrawn from the acquisition, and the records list no other villages for this project.

What to do if your land is listed

Obtain copies of both gazette notices and, if possible, the original notification they correct. Check your survey number and subdivision against the corrected entries, because an erratum may have added, removed or changed details for your land.

Keep your title documents, patta, chitta, adangal and encumbrance certificate ready. If the extent or details shown for your land are wrong, raise this in writing with the land acquisition officer and keep the acknowledgement.

For compensation, the amount is fixed by the competent authority under the Act after inquiry, based on the land and any structures, trees or crops on it. Ask the land acquisition office in Tiruvallur about the award stage and file your claim with proof of ownership.

If you are buying land in this village, check whether the survey number appears in these notices before you pay any advance. Land under acquisition can be taken by the Government whatever private sale takes place, and a buyer may face delays in claiming compensation.

Villages and survey numbers

Each village with the survey numbers its notices name. A survey number that a later notice withdrew is marked. Sub-divisions created by the acquisition may not be on the land records yet, so a notice often names the parent survey.

Tiruvallur district 1 village

  • Veppampattu_87 Tiruvallur taluk · 32 survey numbers

    62/1A1B63/6B81/1C281/4B1B81/5B81/6B83/1A1B83/1B283/33A2137/2I2137/2K2138/7B138/8B138/9B138/10B138/11B138/12B138/13B138/14B138/15B138/16B389/5B389/6B389/7B389/8B389/9B389/10B389/11B389/12B389/13A2389/14B393/12B

Gazette notices, oldest first

  1. Correction

    Tamil Nadu Government Gazette, issue 28 of 2023. Under the Tamil Nadu Highways Act, 2001. 1 village: Veppampattu_87.

    Read the notice (PDF)
  2. Correction

    Tamil Nadu Government Gazette, issue 252 of 2023. Under the Tamil Nadu Highways Act, 2001. 1 village: Veppampattu_87.

    Read the notice (PDF)

What a notice means for a buyer or an owner

A gazette notice records that the government intends to acquire the land, or, for a national highway, a section 3D declaration that the land now vests in the Central Government. A notice is not proof that the acquisition was completed: schedules are corrected and sometimes withdrawn, and a notice can lapse. Before paying an advance on land in these villages, check the exact survey number and confirm the current position with the Special District Revenue Officer (Land Acquisition) for the district.

Check a survey number

Questions people ask about Road Over Bridge at Level Crossing 14 near Veppampattu

Which villages are affected by the Road Over Bridge at Level Crossing 14 near Veppampattu land acquisition?

Only one village is covered: Veppampattu_87, in Tiruvallur taluk, Tiruvallur district. All 32 survey numbers in the notices fall within this village.

How many survey numbers are being acquired for this Road Over Bridge?

The notices cover 32 survey numbers. None of them has been withdrawn according to these records. Check the gazette for the exact subdivisions and extents.

Under which law is the land being acquired?

The acquisition is under the Tamil Nadu Highways Act, 2001, with notices published in the state gazette. This is a state road project, so national highway law does not apply here.

What is the current status of the acquisition?

There are 2 notices, dated January 2023 and July 2023, and both are errata correcting an earlier notification. Neither has been withdrawn. These records do not show the award or possession stage, so confirm the current status with the land acquisition office in Tiruvallur.

How much compensation will landowners get?

The amount is not stated in these notices. Compensation is determined by the competent authority under the Act after an inquiry into the land and anything standing on it. Contact the land acquisition officer for the project to learn the award stage and to submit your claim with ownership documents.

Other acquisitions in Tiruvallur

All land acquisition projects in Tamil Nadu

Source: the schedules of the 2 notices above, published in the Tamil Nadu Government Gazette (Extraordinary). Our reading is partial, so a survey number missing here is not proof the land is free. Data also as JSON.