Power · Tirunelveli

SIPCOT Solar Power Plant, Pallikottai land acquisition: villages and survey numbers

Land is being acquired for the SIPCOT Solar Power Plant at Pallikottai under the Tamil Nadu Acquisition of Land for Industrial Purposes Act, 1997. Two notifications were published in the state gazette, on 29 April 2026 and 8 June 2026. Together they cover 48 survey numbers in one village, Pallikottai, in Manur taluk of Tirunelveli district.

Gazette notices
2
Villages
1
Survey numbers
48
Districts
1
First notice
29 Apr 2026
Latest notice
8 Jun 2026

Read from the gazette schedules. Updated .

What land is being acquired and where

The acquisition is for a solar power plant to be set up through SIPCOT at Pallikottai. All the land notified so far lies in a single village, Pallikottai, in Manur taluk of Tirunelveli district.

The notifications list 48 survey numbers in that village. Some of these may be subdivisions of the same field, so the count of survey numbers is not the same as the count of owners or the extent in acres.

The extent of each parcel is set out in the schedule to each notification. Read that schedule against your own patta before you draw any conclusion.

The notices and their stage

Both notices were issued under the Tamil Nadu Acquisition of Land for Industrial Purposes Act, 1997, and published in the Tamil Nadu Government Gazette. The first is dated 29 April 2026 and the second is dated 8 June 2026.

Under this Act, the State Government acquires land for an industrial purpose by publishing a notice under section 3(1). Before that notice is published, the Act requires the owner and any other person interested to be given a show cause notice and an opportunity to state objections. Once the section 3(1) notice is published, the land vests in the Government free from all encumbrances.

Neither notice has been withdrawn, and neither has been corrected by a later notice. The records available here do not show the stage reached after June 2026, such as the compensation award or the taking of possession. Confirm the present position with the District Revenue Officer or the Special Tahsildar (Land Acquisition) dealing with SIPCOT projects in Tirunelveli.

The village covered

Pallikottai, Manur taluk, Tirunelveli district: 48 survey numbers, none withdrawn.

No other village appears in either notification. If your land is in a neighbouring village, these notices do not cover it, though a later notice could.

What to do if your land is listed

Get a copy of both gazette notifications and compare the survey number, subdivision number and extent in the schedule with your patta, chitta and A register extract. Small differences in subdivision numbers matter, so check each digit.

Keep your title papers ready: sale deeds, parent documents, patta, a recent encumbrance certificate and any legal heirship certificate if the owner has died. Compensation is paid to the person whose title is shown, so mutation and heirship gaps should be cleared early.

If you are a buyer, do not purchase any land in these 48 survey numbers. Land notified under section 3(1) of the 1997 Act vests in the Government, and a private sale after that point gives the buyer no secure title.

If you received a show cause notice and believe your land was wrongly included, or the extent is wrong, take advice from a lawyer promptly. Time limits under the Act are short, and later remedies are narrower.

Villages and survey numbers

Each village with the survey numbers its notices name. A survey number that a later notice withdrew is marked. Sub-divisions created by the acquisition may not be on the land records yet, so a notice often names the parent survey.

Tirunelveli district 1 village

  • Pallikottai Manur taluk · 48 survey numbers

    156/1156/2161/1161/2162/1A162/1B162/2163/1163/2163/3164/1164/2165/1165/2167/1167/2169/1169/2171/1171/2173/1173/2174/1174/2175/1175/2178/1178/2179/1179/2182/1182/2183/1183/2186/1186/2187/1187/2190/1190/2191/1191/2192/1192/2195/1195/2198/1198/2

Gazette notices, oldest first

  1. Notice of intention

    Tamil Nadu Government Gazette, issue 224 of 2026. Under the Tamil Nadu Acquisition of Land for Industrial Purposes Act, 1997. 1 village: Pallikottai.

    Read the notice (PDF)
  2. Notice of intention

    Tamil Nadu Government Gazette, issue 277 of 2026. Under the Tamil Nadu Acquisition of Land for Industrial Purposes Act, 1997. 1 village: Pallikottai.

    Read the notice (PDF)

What a notice means for a buyer or an owner

A gazette notice records that the government intends to acquire the land, or, for a national highway, a section 3D declaration that the land now vests in the Central Government. A notice is not proof that the acquisition was completed: schedules are corrected and sometimes withdrawn, and a notice can lapse. Before paying an advance on land in these villages, check the exact survey number and confirm the current position with the Special District Revenue Officer (Land Acquisition) for the district.

Check a survey number

Questions people ask about SIPCOT Solar Power Plant, Pallikottai

Which villages are in the SIPCOT Solar Power Plant, Pallikottai land acquisition list?

Only one village is covered: Pallikottai in Manur taluk, Tirunelveli district. Both notifications relate to this village alone. No other village is named in the notices so far.

How many survey numbers are being acquired at Pallikottai?

The two notifications together list 48 survey numbers in Pallikottai village. The exact survey and subdivision numbers, with extents, are given in the schedule to each gazette notification. Check your own number against that schedule rather than relying on a summary.

What is the current status of the Pallikottai SIPCOT land acquisition?

Two notifications have been published under the 1997 Industrial Purposes Act, on 29 April 2026 and 8 June 2026, and neither has been withdrawn or corrected. Information on later steps such as the award or possession is not available here. Confirm the status with the land acquisition office of the Tirunelveli District Collectorate.

How is compensation decided for land taken for the SIPCOT solar plant?

Under the 1997 Act, compensation is determined by the land acquisition authority after the land is notified. Following amendments made by Tamil Nadu in 2019, compensation for land acquired under this Act is to be worked out in line with the First Schedule of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. No amount or rate has been published in these records, so confirm the figure for your land with the Special Tahsildar (Land Acquisition) or the District Collectorate.

Can I buy or sell land in the notified survey numbers at Pallikottai?

You should not. Once a notice under section 3(1) of the 1997 Act is published, the land vests in the Government free from encumbrances. A buyer of such land does not get a secure title and cannot claim the compensation in place of the recorded owner.

Other acquisitions in Tirunelveli

All land acquisition projects in Tamil Nadu

Source: the schedules of the 2 notices above, published in the Tamil Nadu Government Gazette (Extraordinary). Our reading is partial, so a survey number missing here is not proof the land is free. Data also as JSON.