तटीय विनियमन क्षेत्र अधिसूचना
The Ministry of Environment and Forests, Government of India, issued the Coastal Regulation Zone Notification on 6 January 2011 in The Gazette of India. It declares specified coastal stretches and nearby tidal water areas as Coastal Regulation Zone, replaces parts of the earlier Ministry of Environment and Forests notification number S.O. 114(E) dated 19 February 1991, and sets bans and controls on industries, construction, waste disposal and other activities in those areas.
What this notification is
The Ministry of Environment and Forests, Government of India, published the Coastal Regulation Zone Notification in The Gazette of India on 6 January 2011. It declares certain coastal land and tidal water related areas as Coastal Regulation Zone, also called CRZ, and applies restrictions on setting up or expanding industries, operations and processes there. The notification plainly says it overrides parts of the Ministry of Environment and Forests notification number S.O. 114(E) dated 19 February 1991, except for the provisions specifically saved in the text.
Which areas are covered
The Coastal Regulation Zone Notification covers these areas:
- Land up to 500 metres from the High Tide Line on the sea side.
- Areas along tidal water bodies connected to the sea, up to 100 metres from the High Tide Line or the width of the creek, whichever is less.
- The inter tidal area between the High Tide Line and the Low Tide Line.
- The area between the hazard line and the 500 metre line on the sea front, and between the hazard line and the 100 metre line for tidal water bodies.
- For tidal water bodies and the sea, the area between the Low Tide Line and the territorial water limit of 12 nautical miles.
The notification says the High Tide Line is to be demarcated uniformly across the country by authorities authorised by the Ministry of Environment and Forests.
What is prohibited
The Coastal Regulation Zone Notification prohibits many activities in CRZ areas, including:
- New industries and expansion of industries, except listed categories such as those needing waterfront or foreshore facilities, certain Department of Atomic Energy projects, certain non conventional energy facilities, desalination plants in specified areas, the green field airport only at Navi Mumbai, and repair or reconstruction of houses of local communities including fisherfolk under local planning rules.
- Manufacture, storage or disposal of hazardous substances, except listed transport and storage related cases.
- Fish processing units, except hatcheries and natural drying of fish, in permitted areas.
- Land reclamation, bunding or disturbing natural seawater flow, except listed essential and scientifically studied works.
- Disposal of untreated wastes and effluents from industries, cities, towns and other settlements.
- Dumping of municipal waste, industrial solid waste and fly ash for land filling.
- Beautification of coastal areas through shopping, housing, hotels and recreation.
- Mining of sand, rocks and other materials, except listed cases.
- Groundwater extraction within 200 metres of the High Tide Line, except limited local use and certain manual extraction between 200 and 500 metres where no other source exists.
- Construction in CRZ I, except activities specified in paragraph 8.
- Altering sand dunes, hills and natural features for beautification or other purposes.
Who this affects
This matters to property buyers, owners, developers, industries, hotels, ports, local communities and fisherfolk in coastal and tidal areas. If land falls inside CRZ, building, expansion, waste disposal, groundwater use and shoreline alteration may be banned or need recommendation or approval through the Coastal Zone Management Authority and planning authorities.
This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.
Common questions
How do I know if my coastal land may fall inside CRZ?
The notification covers land up to 500 metres from the High Tide Line on the sea side, and along tidal water bodies connected to the sea up to 100 metres or the creek width, whichever is less. It also includes the inter tidal area and certain areas linked to the hazard line and Low Tide Line.
Can a new industry be set up in a CRZ area?
The notification generally prohibits new industries and expansion in CRZ areas. It allows only listed exceptions, such as activities that need waterfront or foreshore facilities, certain Department of Atomic Energy projects, certain non conventional energy facilities, desalination plants in specified areas, and some local community housing repair or reconstruction.
Are houses of fishermen and local communities allowed to be repaired or rebuilt?
Yes. The notification allows reconstruction and repair of houses of local communities, including fishermen, according to local town and country planning regulations.
Does the notification restrict groundwater extraction near the coast?
Yes. Groundwater extraction and related construction within 200 metres of the High Tide Line is prohibited, except in areas where local communities live and only for their use. Between 200 and 500 metres, it may be allowed for drinking water, horticulture, agriculture and fisheries by manual means where no other water source is available.