primary law

G.O. (D) No. 22, Acquisition of Land in Oragadam for Road Widening, 2019

The Government of Tamil Nadu, through the Highways and Minor Ports Department, issued G.O. (D) No. 22, Highways and Minor Ports (HS1) Department, dated 31 January 2019, to acquire 3,180 square metres of dry land in No. 134 Oragadam Village, Sriperumbudur Taluk, Kancheepuram District. The land is acquired for widening the road from Sriperumbudur to Singaperumal Koil, with compensation to be paid from the deposit account maintained by the Highways Department's Chief Engineer (Construction and Maintenance).

Category
Gazette notifications
Pages
5
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the notification does

G.O. (D) No. 22, Highways and Minor Ports (HS1) Department, dated 31 January 2019, notifies the acquisition of 3,180 square metres of dry land in No. 134 Oragadam Village. The Government of Tamil Nadu requires the land for widening the road between Sriperumbudur and Singaperumal Koil.

The acquisition was published as Notification No. II(2)/HWMP/206/2019 in the Tamil Nadu Government Gazette dated 6 March 2019. The notification states that reasons submitted by owners, persons claiming rights and persons in possession were considered before publication.

Who may be affected

The acquisition affects owners, occupants and other persons claiming an interest in the 16 scheduled land parcels in Oragadam Village, Sriperumbudur Taluk, Kancheepuram District. It may also affect buyers carrying out due diligence on land covered by the listed survey subdivisions.

The schedule includes land in survey number groups 34, 44 and 57. Some parcel descriptions also record shops, buildings, rooms, compound walls and trees on the land. The notification does not acquire every property in Oragadam Village, only the scheduled parcels and extents.

Key provisions

  • The total scheduled acquisition area is 3,180 square metres.
  • The schedule contains 16 separate parcel entries with survey subdivisions, boundaries, patta references, recorded ownership details and individual extents.
  • The public purpose is widening the road from Sriperumbudur to Singaperumal Koil.
  • Compensation is to be paid from the deposit account maintained by the Chief Engineer (Construction and Maintenance) of the Highways Department.
  • The acquisition notification was issued under section 15(1) of the Tamil Nadu Highways Act, 2001.

How to check a property

The land plans for the acquisition are available in the office of the Special Tahsildar (Land Acquisition), Oragadam Industrial Park Road Infrastructure Project, Kancheepuram. The notification states that the plans may be inspected during office hours.

A buyer or owner should compare the property's village, survey number, subdivision, patta details, boundaries and extent with the schedule and the official plans. A match with only the village name is not enough to establish that a property is included.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

Does the notification acquire all land in Oragadam Village?

No. It covers 16 scheduled parcels totalling 3,180 square metres in No. 134 Oragadam Village.

Why is the land being acquired?

The land is required for widening the road from Sriperumbudur to Singaperumal Koil.

Where can I inspect the acquisition plans?

The plans are available during office hours at the office of the Special Tahsildar (Land Acquisition), Oragadam Industrial Park Road Infrastructure Project, Kancheepuram.

Does the notification state how much compensation each owner will receive?

No individual compensation amounts are stated. It says compensation will be paid from the deposit account maintained by the Highways Department's Chief Engineer (Construction and Maintenance).