primary law

G.O. Ms. No. 123, Acquisition of Lands for Kumbakonam Bye Pass Road, 2010

The Highways and Minor Ports Department, Government of Tamil Nadu, issued G.O. Ms. No. 123, Highways and Minor Ports (HF2), dated 9 April 2010, acquiring specified lands in Srinivasanallur Village, Kumbakonam Taluk, Thanjavur District. The lands, measuring a total of 1.37.58 hectares, are required for formation of the Kumbakonam Bye Pass Road.

Category
Gazette notifications
Pages
2
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the notification does

The Highways and Minor Ports Department notification acquires the lands listed in its schedule for the formation of the Kumbakonam Bye Pass Road. The Governor of Tamil Nadu made the acquisition under sub-section (1) of Section 15 of the Tamil Nadu Highways Act, 2001 (Tamil Nadu Act 34 of 2002).

The Government of Tamil Nadu states that it considered the cause shown by each owner or other interested person before issuing the acquisition notice. The entire compensation amount is to be paid out of lands controlled or managed by the Divisional Engineer (Highways), Tamil Nadu Road Sector Project, Kumbakonam.

Land covered

The acquisition applies to wet and dry lands in Srinivasanallur Village, Kumbakonam Taluk, Thanjavur District. The schedule identifies the following survey subdivisions and extents:

  • Wet land, Survey No. 3-2B, 0.10.50 hectare.
  • Dry land, Survey No. 4-3B, 0.03.11 hectares.
  • Dry land, Survey No. 4-4B2, 0.00.15 hectare.
  • Wet land, Survey No. 43-1B, 0.00.80 hectare.
  • Dry land, Survey No. 46-4B, 0.43.22 hectare.
  • Dry land, Survey No. 48-3B, 0.02.40 hectare.
  • Wet land, Survey No. 48-8B, 0.50.26 hectare.
  • Dry land, Survey No. 42-6B, 0.03.05 hectare.
  • Dry land, Survey No. 50-4A2, 0.17.31 hectare.
  • Dry land, Survey No. 66-2, 0.06.78 hectare.

The total extent stated in the notification is 1.37.58 hectares, a little more or less. The schedule also names the owners and other persons recorded as having an interest in each parcel.

Who should check the notification

The acquisition directly affects the owners and interested persons named in the schedule. A buyer, owner or professional dealing with land in the listed survey subdivisions should check whether the relevant property falls within the acquired area.

Where the plan can be inspected

The land plan is kept at the office of the Special Tahsildar (Land Acquisition), Tamil Nadu Road Sector Project, Thanjavur, Thanjavur District. It may be inspected during office hours.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

Why were these lands acquired?

The lands were acquired for the formation of the Kumbakonam Bye Pass Road.

Which village is covered by the acquisition?

The acquisition covers specified lands in Srinivasanallur Village, Kumbakonam Taluk, Thanjavur District.

How much land does the notification acquire?

The notification states a total extent of 1.37.58 hectares, a little more or less.

Where can I inspect the acquisition plan?

The plan can be inspected during office hours at the office of the Special Tahsildar (Land Acquisition), Tamil Nadu Road Sector Project, Thanjavur, Thanjavur District.