Tamil Nadu Government Gazette, No. 12, Part II, Section 2, 25 March 2015
The Highways and Minor Ports Department issued G.O. (D) No. 22, Highways and Minor Ports (HP2), dated 29 January 2015, and G.O. (D) No. 25, Highways and Minor Ports (HP2), dated 3 February 2015, acquiring specified land for the formation of the Tiruvarur bypass road. The acquisitions cover 4.74.24 hectares in Perumbukalur Village and 5.74.02 hectares in Keezhakavathukudi Village, with the affected survey numbers, land classifications, extents and interested persons listed in the schedules.
What the notifications do
The Highways and Minor Ports Department notifications formally acquire dry and wet land needed to form the Tiruvarur bypass road. They were published in the Tamil Nadu Government Gazette on 25 March 2015 under the Tamil Nadu Highways Act, 2001.
The Governor of Tamil Nadu issued the acquisition notices after considering the cause shown by owners or other people having an interest in the land. The compensation is to be paid from funds controlled or managed by the Divisional Engineer (Construction and Maintenance), Highways Department, Tiruvarur.
Areas and land covered
G.O. (D) No. 22, Highways and Minor Ports (HP2), dated 29 January 2015, covers Perumbukalur Village in Nannilam Taluk, Tiruvarur District.
- Total acquired extent is 4.74.24 hectares, a little more or less.
- The schedule identifies 29 entries by survey number.
- Both wet and dry land are included.
- The listed survey numbers range across Survey Nos. 57, 66, 67, 68, 69, 70, 71, 90, 93 and 94.
G.O. (D) No. 25, Highways and Minor Ports (HP2), dated 3 February 2015, covers Keezhakavathukudi Village in Tiruvarur Taluk and District.
- Total acquired extent is 5.74.02 hectares, a little more or less.
- The schedule records survey number, classification, total extent, acquired extent, structures if any, and the names of owners or interested persons.
- The supplied text includes entries from Survey Nos. 1, 2, 3, 46, 48, 49 and 52.
Who should check the schedules
Owners, buyers, lenders and professionals dealing with land in Perumbukalur Village or Keezhakavathukudi Village should compare the property survey number and subdivision with the relevant schedule. A person may be affected even where only part of a larger survey field is acquired, because the schedules separately state the total field extent and the acquired extent.
Where the plans can be inspected
The land plans for both acquisitions are kept at the office of the District Collector, Tiruvarur. The notifications state that the plans may be inspected during office hours.
This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.
Common questions
Does the acquisition cover all land in the listed survey numbers?
Not necessarily. The schedules separately show each survey field's total extent and the smaller extent acquired, although some listed parcels may be acquired in full.
Where can I inspect the acquisition plan?
The plans are kept in the office of the District Collector, Tiruvarur, and may be inspected during office hours.
What is the land being acquired for?
The specified land is being acquired for the formation of the Tiruvarur bypass road.
Does the notification state the compensation amount?
No compensation amount is stated. It says the entire compensation is to be paid from funds controlled or managed by the Divisional Engineer (Construction and Maintenance), Highways Department, Tiruvarur.