primary law

G.O. (2D). No. 4, Acquisition of Lands, 2011

The Highways and Minor Ports Department issued G.O. (2D). No. 4, Highways and Minor Ports (HS.1), dated 17th February 2011, to acquire about 59,911 square metres of land in Mathur Village, Sriperumbudur Taluk, Kanchipuram District. The land is required for widening and strengthening the Singaperumal Koil to Sriperumbudur Road, and the acquisition affects the owners and other interested persons identified in the land schedule.

Category
Gazette notifications
Pages
14
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the notification does

G.O. (2D). No. 4, Highways and Minor Ports (HS.1), dated 17th February 2011, records the Governor of Tamil Nadu's acquisition of approximately 59,911 square metres of land under the Tamil Nadu Highways Act, 2001. The stated public purpose is widening and strengthening the Singaperumal Koil to Sriperumbudur Road in Mathur Village, Sriperumbudur Taluk, Kanchipuram District.

The notification states that the causes shown by owners or other persons with an interest in the lands were considered before publication of the acquisition notice.

Who is affected

G.O. (2D). No. 4 affects registered landholders and other interested persons connected with the properties listed in the schedule for Mathur Village. The schedule identifies individual parcels by land classification, original survey number, new subdivision number, registered holder, boundaries and area.

The listed properties include both wet and dry ryotwari land. Registered holders shown in the supplied schedule include individuals, joint holders, M/s. Arun Excello, Arulmigu Raagal Amman Koil and SIPCOT. A buyer, owner or professional dealing with land in the listed survey fields should compare the property's current survey and subdivision details with the acquisition schedule.

Key provisions

G.O. (2D). No. 4 provides that:

  • About 59,911 square metres, a little more or less, are acquired for the road project.
  • The affected land is situated in 135 Mathur Village, Sriperumbudur Taluk, Kanchipuram District.
  • The schedule gives parcel-specific survey numbers, subdivisions, registered holders, boundaries and measurements.
  • The entire compensation amount is to be paid from funds controlled and managed by the Chief Engineer (Construction and Maintenance), Highways Department, Chennai.
  • The land plan is kept at the office of the Tahsildar, Sriperumbudur.
  • The plan may be inspected during office hours.

Practical relevance for property checks

G.O. (2D). No. 4 can affect ownership and transactions where a property falls within a scheduled parcel. Survey numbers alone may not be enough because many original survey numbers were assigned new subdivisions. Verification should therefore include the subdivision, boundaries, recorded holder and scheduled area, together with inspection of the plan held by the Tahsildar, Sriperumbudur.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

Why were these lands acquired?

The lands were acquired for widening and strengthening the Singaperumal Koil to Sriperumbudur Road in Mathur Village.

How much land does the acquisition cover?

The notification states that approximately 59,911 square metres, a little more or less, are acquired.

Where can I inspect the acquisition plan?

The plan is kept in the office of the Tahsildar, Sriperumbudur, and may be inspected during office hours.

Who will provide the compensation funds?

The entire compensation amount is to be paid from funds controlled and managed by the Chief Engineer (Construction and Maintenance), Highways Department, Chennai.