primary law

G.O. Ms. No. 28, Acquisition of Lands, 2013

The Highways and Minor Ports Department, through G.O. Ms. No. 28, Highways and Minor Ports (HW2), dated 12th March 2013, acquires specified lands in Attipattu-II Village, Ponneri Taluk, Tiruvallur District. The acquisition covers about 9,025 square metres required to construct a railway overbridge in place of Level Crossings No. 13 and 14 between Ennore and Attipattu Railway Stations.

Category
Gazette notifications
Pages
17
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the notification does

The Highways and Minor Ports Department notification under G.O. Ms. No. 28, Highways and Minor Ports (HW2), dated 12th March 2013, records the Governor of Tamil Nadu's acquisition of land for a railway overbridge. The project is at railway kilometre 29/28-30, near Attipattu, between Ennore and Attipattu Railway Stations.

The acquisition is made under sub-section (1) of Section 15 of the Tamil Nadu Highways Act, 2001. The total area stated is approximately 9,025 square metres.

Who may be affected

The notification directly affects registered holders, owners and other persons with an interest in the listed lands in Attipattu-II Village, Ponneri Taluk, Tiruvallur District. Buyers and professionals checking property in this area should compare the property's survey number and subdivision with the schedule.

The schedule identifies affected land through details including:

  • Survey numbers and newly created subdivision numbers.
  • Patta numbers and registered holder names.
  • Land classification, shown as Government, Wet.
  • Boundaries on the north, east, south and west.
  • The area acquired from each listed parcel, in square metres.

The listed parcels include subdivisions within Survey Nos. 172 and 175. The schedule names several private registered holders and also land registered to the Commissioner, Panchayat Union, Minjur, and the North Chennai Thermal Power Station.

Key provisions

  • The land is acquired for highways purposes, specifically construction of a railway overbridge replacing Level Crossings No. 13 and 14.
  • The Governor considered the cause shown by owners or other interested persons before publishing the acquisition notice.
  • The entire compensation amount is to be paid from funds controlled or managed by the Chief Engineer (Construction and Maintenance), Highways Department.
  • The stated total extent may be a little more or less than 9,025 square metres.
  • Plans of the acquired lands are kept at the office of the Tahsildar, Ponneri.
  • The plans may be inspected during office hours.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

How can I check whether my land is included in the acquisition?

Compare your survey number, subdivision, patta holder details and boundaries with the schedule. The land plans can also be inspected during office hours at the office of the Tahsildar, Ponneri.

Why is the land being acquired?

The land is required to construct a railway overbridge near Attipattu in place of Level Crossings No. 13 and 14 between Ennore and Attipattu Railway Stations.

How much land is covered by the notification?

The notification states a total extent of about 9,025 square metres, a little more or less.

Who will fund compensation for the acquired land?

The entire compensation amount is to be paid from funds controlled or managed by the Chief Engineer (Construction and Maintenance), Highways Department.