primary law

Declaration of Multistoried Building Area for construction of Educational Buildings at Kesavarayan Pettai Village, Melmaruvathur Panchayat, Cheyyur Taluk, Kancheepuram District

The Government of Tamil Nadu, under General Notifications issued by Heads of Departments, published Notification No. VI(1)/163/2014, Record of Proceedings No. 23916/2013/Special Cell, in the Tamil Nadu Government Gazette on 23 April 2014. It declares Survey Number 68/1 in Kesavarayanpettai Village, Melmaruvathur Panchayat, Cheyyur Taluk, Kancheepuram District, as a multistoried building area for educational buildings, subject to specified planning, safety, accessibility and environmental conditions.

Category
Gazette notifications
Pages
10
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

Land covered

Notification No. VI(1)/163/2014, Record of Proceedings No. 23916/2013/Special Cell, applies to Survey Number 68/1 in Kesavarayanpettai Village, Melmaruvathur Panchayat, Cheyyur Taluk, Kancheepuram District. The stated area is 346,350 square metres, recorded as 34.63.50 hectares.

The Government of Tamil Nadu published the notification under General Notifications issued by Heads of Departments in the Tamil Nadu Government Gazette on 23 April 2014. The land is declared a multistoried building area specifically for constructing educational buildings under the Tamil Nadu Multistoried and Public Building Rules, 1973 and related instructions.

Who is affected

Notification No. VI(1)/163/2014 directly affects the owner, developer, educational institution and professionals preparing or clearing building plans for the identified survey number. A buyer considering this land should note that the declaration is tied to educational buildings and does not remove the stated approval and compliance requirements.

Main planning and approval conditions

Notification No. VI(1)/163/2014 requires the following when building plans are cleared:

  • Floor Space Index, plot coverage and other multistoried building requirements must comply with applicable rules and instructions.
  • Necessary clearances and No Objection Certificates must be obtained from the Commissioner of Town and Country Planning, Highway Department, Traffic Police Department, Fire Service Department, Chennai Regional Advisory Committee, Airport Authority, Microwave Authority and Tamil Nadu Pollution Control Board.
  • Environmental Impact Assessment clearance must be obtained from the Ministry of Environment and Forest Department, Government of India, as required by the latest Central Government notification referred to in the document.
  • The building must be earthquake resistant, designed by a Registered Professional Structural Engineer and based on the National Building Code 2005.
  • Fire extinguishers, an emergency open staircase and sufficient lifts must be provided.
  • Ramps, a ramp ratio of 1:10, lift access and parking near the entrance must be provided for physically challenged persons.
  • Drainage, a sewage treatment plant, rainwater harvesting and arrangements for solar energy must be included.
  • Each floor must have a height of at least 3 metres.
  • Expansion joints with a 75 millimetre gap must be provided at intervals of 45 metres.
  • A No Objection Certificate concerning possible road widening must be obtained from the Highways and Rural Works Department.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

Which property is covered by this declaration?

It covers Survey Number 68/1 in Kesavarayanpettai Village, Melmaruvathur Panchayat, Cheyyur Taluk, Kancheepuram District, measuring 346,350 square metres.

Can the declared land be used for a multistoried educational building?

Yes. The land is declared a multistoried building area for educational buildings, subject to the listed rules, clearances and building plan conditions.

Does the notification itself provide all necessary building approvals?

No. The applicant must obtain the required clearances and No Objection Certificates from the authorities listed in the notification and submit the required environmental clearance.

What accessibility features must the building provide?

The plans must provide ramps to the lift room, show a ramp ratio of 1:10 and include sufficient parking near the entrance for physically challenged persons.