primary law

Tamil Nadu Government Gazette, Part VI, Section 1, No. 18 (18 VI 1 v8)

The Government of Tamil Nadu published this Gazette on 4 May 2016, containing land use variations issued by the Coimbatore Local Planning Authority, Kurichi New Town Development Authority and Mamallapuram Local Planning Authority. The variations implement G.O. (2D) No. 38 of the Housing and Urban Development UD4(1) Department dated 22 February 2016, G.O.Ms.No. (2D) No. 59 of the Housing and Urban Development UD4(1) Department dated 1 March 2016, and G.O. (2D) No. 14 of the Housing and Urban Development UD4(1) Department dated 19 January 2016.

Category
Gazette notifications
Pages
5
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the Gazette changes

The Tamil Nadu Government Gazette, Part VI, Section 1, No. 18 modifies the approved master plans for specified survey numbers in the Coimbatore, Kurichi and Mamallapuram planning areas. Property owners, buyers and developers dealing with the listed land should note its revised residential, commercial or industrial classification and, for the Mamallapuram variation, its development conditions.

Coimbatore Local Planning Area

The Coimbatore Local Planning Authority notification, No. VI(1)/173/2016, gives effect to G.O. (2D) No. 38 of the Housing and Urban Development UD4(1) Department dated 22 February 2016. It changes the land use schedule for Kalapatti Detailed Development Plan No. 25:

  • Survey Number 572 remains under industrial use, except Survey Numbers 572/3 and 572/5.
  • Survey Number 572/5 is added to residential use.
  • Survey Number 572/3 is added to commercial use.

Kurichi New Town Development Plan

The Kurichi New Town Development Authority notification, No. VI(1)/174/2016, implements G.O.Ms.No. (2D) No. 59 of the Housing and Urban Development UD4(1) Department dated 1 March 2016. For Seerapalayam Village:

  • Survey Number 246/3B2B, measuring 0.07.00 hectare or 7,550 square feet, is removed from the General Industrial Use Zone.
  • The same land is added to the Mixed Residential Use Zone.
  • The existing approved land use continues for the remaining part of Survey Number 246.

Mamallapuram Local Planning Area

The Mamallapuram Local Planning Authority notification, No. VI(1)/175/2016, implements G.O. (2D) No. 14 of the Housing and Urban Development UD4(1) Department dated 19 January 2016. Survey Number 1395E/2B in Thaiyur Village is removed from the Mixed Residential Use Zone and added to the Commercial Use Zone.

The Mamallapuram variation also requires:

  • The applicant to arrange their own water supply, sewage treatment plant details and generator facilities for the proposed building.
  • Maintenance of an open space reservation area equal to 10 percent of the total extent.

Other contents

The Tamil Nadu Government Gazette issue also contains Chennai summer recess arrangements for urgent criminal and civil matters, and a High Court notification conferring specified magisterial powers on listed Tahsildars in Kancheepuram District.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

Does all of Survey Number 246 in Seerapalayam become residential?

No. Only Survey Number 246/3B2B, measuring 0.07.00 hectare or 7,550 square feet, is moved from general industrial use to mixed residential use. The existing approved land use continues for the remaining part of Survey Number 246.

What are the new land uses for Survey Numbers 572/3 and 572/5 in Kalapatti?

Survey Number 572/3 is added to commercial use, while Survey Number 572/5 is added to residential use. They are excluded from the industrial entry for Survey Number 572.

Can Survey Number 1395E/2B in Thaiyur Village be used commercially?

The Mamallapuram Local Planning Authority variation adds Survey Number 1395E/2B to the Commercial Use Zone and removes it from the Mixed Residential Use Zone.

Are there development conditions for the Thaiyur commercial land?

Yes. The applicant must arrange their own water supply, sewage treatment plant details and generator facilities, and maintain an open space reservation area equal to 10 percent of the total extent.