primary law

Acquisition of Lands (206 Ex VI 1)

The Principal Secretary and Commissioner of Land Administration published land acquisition notices Roc.CKICP/CLA/15(1)/SH-23/89/2021 and Roc.CKICP/CLA/15(1)/SH-23/90/2021 in Tamil Nadu Government Gazette Extraordinary No. 206 on April 22, 2021. The notices acquire specified land in Thirunalkondacheri Village, Mayiladuthurai District, and Peralam Village, Tiruvarur District, for widening State Highway 23 under the Chennai-Kanniyakumari Industrial Corridor Project.

Category
Gazette notifications
Pages
9
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the notifications do

The Principal Secretary and Commissioner of Land Administration issued two acquisition notices under the Tamil Nadu Highways Act, 2001, read with the Tamil Nadu Land Acquisition Laws (Revival of Operation, Amendment and Validation) Act, 2019. The Governor of Tamil Nadu notified the scheduled lands as acquired for widening the Mayiladuthurai - Tiruvarur Road, State Highway 23, under the Chennai-Kanniyakumari Industrial Corridor Project.

The acquisition affects the owners and other interested persons named in the schedules. It may also matter to buyers or professionals checking property in the listed survey numbers, because parts of those properties, together with recorded structures, trees and other assets, fall within the acquisition.

Thirunalkondacheri Village acquisition

Roc.CKICP/CLA/15(1)/SH-23/89/2021 covers widening between kilometre 5/006 and kilometre 5/102 in Thirunalkondacheri Village, Kuttalam Taluk, Mayiladuthurai District.

Key details are:

  • Total land acquired is 651 square metres.
  • The scheduled land is classified as wet land.
  • The affected survey numbers are 146, 153 and 154, with new subdivisions 146/2, 153/2 and 154/2.
  • The schedule names A/M. Veerateshwara Swamy Koil as the owner or interested person.
  • Recorded assets include coconut trees, a mango tree and paddy cultivation.

Peralam Village acquisition

Roc.CKICP/CLA/15(1)/SH-23/90/2021 covers widening between kilometre 15/400 and kilometre 16/850 in Peralam Village, Nannilam Taluk, Tiruvarur District.

Key details are:

  • Total land acquired is 6,748 square metres.
  • The schedule includes dry, wet and manai land.
  • Recorded assets include houses, shops, sheds, compound walls, fencing, electricity equipment, water facilities, trees and cultivated land.
  • Named owners or interested persons include A/M. Suyambunathasamy Koil, A/M. Parvathiswarasamy Kovil, A/M. Adhikesava Perumal Koil and Thiruvasal.

Compensation and plan inspection

The acquisition notices state that compensation will be paid from funds controlled and managed by the Divisional Engineer (Highways), Kumbakonam, Chennai-Kanniyakumari Industrial Corridor Project. Acquisition plans may be inspected during office hours at the Special District Revenue Officer (Land Acquisition) office in Kumbakonam or the Special Tahsildar (Land Acquisition) office in Sirkali.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

How can I check whether my land is included in the acquisition?

Compare the village, taluk, survey number and subdivision number in your property records with the schedules. The acquisition plans are also available for inspection during office hours at the specified land acquisition offices in Kumbakonam and Sirkali.

How much land is acquired in each village?

The notification acquires 651 square metres in Thirunalkondacheri Village and 6,748 square metres in Peralam Village.

Does the Peralam acquisition include buildings and shops?

Yes. The Peralam schedule records affected houses, shops, sheds, compound walls, flooring, gates, electricity equipment and other immovable assets on various acquisition extents.

Who is responsible for funding compensation?

The notices state that the compensation amount will be paid from funds controlled and managed by the Divisional Engineer (Highways), Kumbakonam, Chennai-Kanniyakumari Industrial Corridor Project.