primary law

Tamil Nadu Government Gazette Extraordinary No. 269

The Office of the Commissioner of Land Administration, Government of Tamil Nadu, published Tamil Nadu Government Gazette Extraordinary No. 269 on July 7, 2020, containing land acquisition notices under the Tamil Nadu Highways Act, 2001. The notices identify land required in Oduvampalayam and Kuppandapalayam villages in Namakkal District, and Rarathimangalam Village in Nagapattinam District, for strengthening and widening roads under the Chennai Kanniyakumari Industrial Corridor Project.

Category
Gazette notifications
Pages
37
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the Gazette governs

Tamil Nadu Government Gazette Extraordinary No. 269 records the acquisition of specified land for highway improvements under the Chennai Kanniyakumari Industrial Corridor Project. The Office of the Commissioner of Land Administration published the notices after consideration of objections or causes shown by owners and other interested persons.

The schedules identify survey numbers, land classification, acquisition area, physical assets and recorded owners or interested persons. Buyers, owners and professionals dealing with land in the listed villages should check whether the relevant survey number or subdivision appears in the schedules.

Oduvampalayam Village

The notice bearing Roc. No. J1/7143/2020 covers dry land in 41 Oduvampalayam Village, Tiruchengode Taluk, Namakkal District.

Key provisions include:

  • A total of 12,210 square metres is required.
  • The purpose is strengthening and widening the State Highway 86 Omalur, Sankagiri, Tiruchengode, Paramathi Road, including the Tiruchengode Bypass, from kilometre 7.300 to kilometre 7.760.
  • The schedule includes parts of survey numbers 67, 70 and 71.
  • Listed assets include compound walls, borewells, pipelines, tanks, trees and a high voltage transmission tower.

Kuppandapalayam Village

Notification No. VI(1)/202(b-2)/2020 covers dry land in 40 Kuppandapalayam Village, Tiruchengode Taluk, Namakkal District.

Key provisions include:

  • A total of 38,267 square metres is required.
  • The land supports widening of the same State Highway 86 corridor from kilometre 7.700 to kilometre 9.000.
  • The schedule lists numerous survey subdivisions and identifies owners or interested persons.
  • Recorded assets include wells, borewells, pipelines, trees, walls, flooring, a bathroom and other structures.

Rarathimangalam Village

Notification No. VI(1)/202(b-3)/2020 concerns land in Rarathimangalam Village, Nagapattinam Taluk, Nagapattinam District.

  • The purpose is strengthening and widening State Highway 23, Mayiladuthurai, Tiruvarur Road, from kilometre 29/349 to kilometre 29/613.
  • The supplied schedule identifies wet land in survey numbers 4 and 6.
  • Listed assets include cotton cultivation, fencing, trees, sheds, brick walls and compound walls.

Inspection and compensation

Plans for the Namakkal acquisitions may be inspected during office hours at the Special District Revenue Officer (Land Acquisition), Chennai Kanniyakumari Corridor Project, Salem, and the Special Tahsildar (Land Acquisition), Chennai Kanniyakumari Industrial Corridor Project, Namakkal. Compensation for each acquisition is to be paid from funds controlled and managed by the divisional engineer identified in the relevant notice.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

How can I check whether my land is included in the Namakkal acquisition?

Compare the village, survey number and subdivision with the relevant schedule. The acquisition plans may also be inspected during office hours at the listed land acquisition offices in Salem and Namakkal.

Does the acquisition cover only vacant land?

No. The schedules include vacant land as well as land containing wells, pipelines, walls, buildings, trees, cultivation and other physical assets.

How much land is being acquired in Oduvampalayam and Kuppandapalayam?

The notices specify 12,210 square metres in Oduvampalayam Village and 38,267 square metres in Kuppandapalayam Village.

Who is responsible for paying compensation?

For the Namakkal acquisitions, compensation is to come from funds controlled and managed by the Divisional Engineer, Salem, Chennai Kanniyakumari Industrial Corridor Project. For the Rarathimangalam acquisition, the funds are controlled and managed by the Divisional Engineer (Highways), Kumbakonam, Chennai Kanniyakumari Industrial Corridor Project.