primary law

Tamil Nadu Government Gazette, No. 31, Part VI, Section 1 (31 VI 1 v5)

The Government of Tamil Nadu published Tamil Nadu Government Gazette No. 31, Part VI, Section 1, dated 4 August 2021, containing notifications from the Commissioner of Land Administration, the Housing and Urban Development Department, the Tiruppur Local Planning Authority and District Town and Country Planning. It amends the village named in Proceeding Order No. S2/10944/2020 dated 25 November 2020, varies land use entries under G.O. (2D) No. 127 dated 24 July 2020, and corrects the heading of an earlier Thiruthuraipoondi planning notification.

Category
Gazette notifications
Pages
3
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the Gazette covers

Tamil Nadu Government Gazette No. 31, Part VI, Section 1, dated 4 August 2021, publishes three separate land and planning notices. They concern a highways land acquisition record, the Tiruppur Local Planning Area Second Master Plan and a correction relating to the Thiruthuraipoondi Local Planning Area.

Land acquisition record near Tambaram

The Commissioner of Land Administration issued an amendment under Roc. No. S2/10944/2020, signed at Chennai on 6 July 2021. It changes the appendix to Proceeding Order No. S2/10944/2020 dated 25 November 2020, which was issued under Section 15(1) of the Tamil Nadu Highways Act, 2001 for construction of a road over bridge in place of level crossing 32 between Tambaram and Perungalathur railway stations.

The appendix is corrected as follows:

  • The district remains Kancheepuram District.
  • The taluk remains Tambaram Taluk.
  • No. 28, Perungalathur Village (Part II) is replaced with No. 11, Peerkankaranai Village (Part II).

Tiruppur master plan variation

The Housing and Urban Development Department issued G.O. (2D) No. 127, Housing and Urban Development [UD4(1)], dated 24 July 2020. The variation was published by the Member-Secretary (In-charge), Tiruppur Local Planning Authority, at Tiruppur on 29 July 2021.

For Tiruppur Corporation, Chettipalayam Village, the Second Master Plan land use schedule is varied as follows:

  • Under “Existing Road / Cart Track”, survey number 81 is changed to 81 part.
  • Under “Mixed Residential Use (MR)”, survey numbers 81/2 and 81/3 are added.
  • The notification also directs that survey numbers 81/2 and 81/3 be added after entry 60 under “Mixed Residential Use (MR)”.

Thiruthuraipoondi planning correction

District Town and Country Planning issued an erratum under Roc. No. 92/2020/TVR at Tiruvarur on 29 July 2021. It corrects the heading of Variation Notification No. VI(1)/489/2020, published on 9 December 2020.

The heading referring to a variation of the approved master plan is replaced with “Variation to the Consented Detailed Development Plan No.3 of the Thiruthuraipoondi Local Planning Area”.

Who may be affected

The notices are relevant to people checking land records in Peerkankaranai or Perungalathur, land use entries for survey numbers 81, 81/2 or 81/3 in Chettipalayam Village, or the legal description of the Thiruthuraipoondi planning variation.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

Which village is now named in the Tambaram acquisition appendix?

The amended appendix names No. 11, Peerkankaranai Village (Part II), Tambaram Taluk, Kancheepuram District, instead of No. 28, Perungalathur Village (Part II).

What happens to survey number 81 in Chettipalayam Village?

Under the Tiruppur Second Master Plan land use schedule, survey number 81 under “Existing Road / Cart Track” is changed to 81 part. Survey numbers 81/2 and 81/3 are added under “Mixed Residential Use (MR)”.

Does the Thiruthuraipoondi notice concern the approved master plan?

The corrected heading identifies it as a variation to the Consented Detailed Development Plan No. 3 of the Thiruthuraipoondi Local Planning Area, not a variation to the approved master plan.

Why was the Tambaram area land acquisition notification issued?

The source states that the proceeding concerns construction of a road over bridge in place of level crossing 32 between Tambaram and Perungalathur railway stations.