primary law

Declaration of Mutlistoried Building area for construction of Residential Building at Tiruchirappalli Municipal Corporation, Tiruchirappalli Local Planning Area

The Tamil Nadu Government Gazette, Part VI, Section 1, carries a notification by the Commissioner of Town and Country Planning, Roc. No. 22529/2008/Special Cell, dated 14th September 2009, declaring land at Town Survey Number 2/5, Ward K, Block 2, Ponmalai Zone, Door No. 1, Lawson’s Road, Tiruchirappalli Municipal Corporation, Tiruchirappalli Local Planning Area, as a multistoried building area for construction of a residential building. It applies to a site measuring 4816 square metres and says building plan clearance must comply with conditions under the Tamil Nadu Multistoried and Public Building Rules, 1973 and related instructions.

Category
Gazette notifications
Pages
6
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What this notification does

The Commissioner of Town and Country Planning, in Roc. No. 22529/2008/Special Cell, dated 14th September 2009, published a notification in the Tamil Nadu Government Gazette declaring a specific site in Tiruchirappalli as a multistoried building area for construction of a residential building.

The land identified is:

  • Town Survey Number 2/5
  • Ward K, Block 2
  • Ponmalai Zone
  • Door No. 1, Lawson’s Road
  • Tiruchirappalli Municipal Corporation
  • Tiruchirappalli Local Planning Area
  • Extent, 4816 square metres

What law it is under

The notification says the declaration is made under the Tamil Nadu Multistoried and Public Building Rules, 1973 and the instructions under those rules.

It also says that, in addition to the declaration, compliance with conditions must be ensured at the time of clearing the building plans.

Who this affects

This matters mainly to:

  • the owner or developer of this site
  • anyone buying flats or rights in a proposed multistoried residential project on this land
  • architects, engineers and planning professionals preparing the building plans
  • authorities dealing with plan clearance for the project

For most other property owners in Tiruchirappalli, the notification does not change their land directly. It is site specific.

Key points for buyers and owners

  • The notification does not cover all of Tiruchirappalli. It applies only to the land specifically described in the notice.
  • The declaration allows the site to be treated as a multistoried building area for a residential building.
  • Building plan approval is not automatic from the declaration alone. The notification says conditions must be complied with when the plans are cleared.
  • The source text provided here shows the heading "Conditions:" but does not include the actual list of conditions for the Tiruchirappalli residential building notification.

What is not shown in the source text

The source text does not include:

  • the detailed conditions attached to this Tiruchirappalli residential building declaration
  • any approval of a final building plan
  • any statement about number of floors, setbacks, parking, or other project specifications for this site

So, from this text alone, the safe conclusion is that the land has been declared eligible as a multistoried building area for residential construction, subject to conditions to be checked at plan clearance stage.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

Does this notification apply to my property in Tiruchirappalli?

Only if your property is the specific site described in the notification, Town Survey Number 2/5, Ward K, Block 2, Ponmalai Zone, Door No. 1, Lawson’s Road, Tiruchirappalli Municipal Corporation, Tiruchirappalli Local Planning Area.

What kind of project is this land declared for?

The notification declares the land as a multistoried building area for construction of a residential building.

Does the notification itself mean the building plans are fully approved?

No. The text says compliance with conditions must be ensured at the time of clearing the building plans.

Are the detailed conditions available in the source text?

No. The source text ends after the word "Conditions:" for the Tiruchirappalli notification, so the actual list of conditions is not included in the material provided.