G.O. Ms. No. 125, Acquisition of Lands, 2011
The Highways and Minor Ports Department, Government of Tamil Nadu, issued G.O. Ms. No. 125, Highways and Minor Ports (HW2), dated 24 October 2011, acquiring about 460 square metres of land in Pedhikuppam Village, Gummidipoondi Taluk, Thiruvallur District. The land is required to construct a road over bridge replacing Level Crossing No. 37 between Elavur and Gummidipoondi railway stations.
What the acquisition does
G.O. Ms. No. 125, Highways and Minor Ports (HW2), dated 24 October 2011, records the Governor of Tamil Nadu's acquisition of the scheduled lands under the Tamil Nadu Highways Act, 2001. The notified extent is 460 square metres, a little more or less.
The acquisition is for constructing a road over bridge in place of the existing Level Crossing No. 37 at railway kilometre 49/4-6, between Elavur and Gummidipoondi railway stations, near Gummidipoondi.
Land covered
The schedule issued by the Highways and Minor Ports Department covers land in Pedhikuppam Village, Gummidipoondi Taluk, Thiruvallur District. It identifies the following survey numbers or new subdivisions:
- Survey No. 150/1A1, Patta No. 5432, registered holder R. Raniammal.
- Survey No. 150/1A2B, formed from Survey No. 150/1A2, Patta No. 1606, registered holder P. Banumathi.
- Survey No. 150/1A3B, formed from Survey No. 150/1A3, Patta No. 1606, registered holder P. Banumathi.
- Survey No. 150/1A4B, formed from Survey No. 150/1A4, Patta No. 5432, registered holder R. Raniammal.
- Survey No. 150/1B2, formed from Survey No. 150/1B, Patta No. 903, registered holder M. Rajendran.
- Survey No. 150/3B2, formed from Survey No. 150/3B, Patta No. 5432, registered holder R. Raniammal.
- Survey No. 150/4A2, formed from Survey No. 150/4A, Patta No. 5432, registered holder R. Raniammal.
- Survey No. 150/5A2, formed from Survey No. 150/5A, Patta No. 5432, registered holder R. Raniammal.
Who may be affected
G.O. Ms. No. 125 directly affects the registered holders and anyone else having an interest in the scheduled parcels. Buyers and professionals dealing with land in the listed survey subdivisions should compare the property's survey details with the acquisition schedule and plan.
Plan and compensation
The acquisition plan is kept in the office of the Tahsildar, Gummidipoondi, and may be inspected during office hours. Compensation for the acquired lands is to be paid from funds controlled and managed by the Chief Engineer (Highways), Projects, Highways Department, Chennai-15.
This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.
Common questions
Does the notification acquire all land in Pedhikuppam Village?
No. G.O. Ms. No. 125 identifies specific survey numbers and subdivisions in Pedhikuppam Village and states a total acquisition extent of about 460 square metres.
Where can I inspect the acquisition plan?
The plan is available at the office of the Tahsildar, Gummidipoondi, and may be inspected during office hours.
Why is the land being acquired?
The land is required to construct a road over bridge replacing Level Crossing No. 37 between Elavur and Gummidipoondi railway stations, near Gummidipoondi.
Who will fund the compensation for the acquired land?
The compensation is to be paid from funds controlled and managed by the Chief Engineer (Highways), Projects, Highways Department, Chennai-15.