primary law

G.O. (D) No. 247, Acquisition of Lands, 2013

The Highways and Minor Ports Department of the Government of Tamil Nadu, through Government Order (D) Number 247, Highways and Minor Ports (HP1), dated 11 December 2013, acquires scheduled dry lands in Edappadi Village, Edappadi Taluk, Salem District, for the formation of the Edappadi Bypass Road. The notification identifies affected survey numbers, proposed subdivisions, recorded owners, acquisition extents and certain structures or trees.

Category
Gazette notifications
Pages
30
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the notification does

Government Order (D) Number 247, Highways and Minor Ports (HP1), dated 11 December 2013, is a land acquisition notification issued by the Highways and Minor Ports Department of the Government of Tamil Nadu. It states that the Governor of Tamil Nadu acquires the dry lands listed in its schedule for a highways purpose.

The land is required to form the Edappadi Bypass Road. The planned road branches at kilometre 12/8 of the Sankari to Edappadi Road and joins at kilometre 23/2 of the Kumarapalayam to Edappadi Road, through the roads identified in the notification.

Who may be affected

The notification directly affects owners and other persons having an interest in the scheduled land in Edappadi Village, Edappadi Taluk, Salem District. It may also matter to buyers, lenders and property professionals checking land within the following survey numbers:

  • Survey Numbers 5/2, 5/4 and 5/5.
  • Survey Numbers 7/1A, 7/1B, 7/2 and 7/3.
  • Survey Numbers 8/1, 8/4 and 8/5.
  • Survey Numbers 12/1B, 12/2, 12/4C, 12/8 and 12/9.

The schedule gives proposed new subdivision numbers and the portion placed under acquisition. A buyer should therefore compare both the original survey number and the proposed subdivision with the property's records.

Key provisions

  • The Governor states that the listed lands are required for the Edappadi Bypass Road.
  • The notification records that the causes shown by owners or other interested persons were considered.
  • Compensation is to be paid from funds controlled or managed by the Divisional Engineer (Highways), Salem.
  • All scheduled parcels are classified as dry land.
  • The schedule records a partly affected terraced building and a thatched cattle shed in proposed Survey Number 7/1B2.
  • It also records one palm tree in proposed Survey Number 7/3B and two palm trees in proposed Survey Number 12/8B.
  • The land plan is kept in the office of the District Collector, Salem, and may be inspected during office hours.

What a property buyer should check

A person dealing with land in the listed survey numbers should inspect the acquisition plan and verify whether the property falls within the proposed subdivision and acquisition extent. The recorded owner's name alone should not be treated as sufficient because the schedule identifies only the owners recorded when the notification was issued.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

Does this notification affect all land in Edappadi Village?

No. Government Order (D) Number 247 identifies particular survey numbers, proposed subdivisions and acquisition extents in Edappadi Village.

Where can I inspect the acquisition plan?

The notification says the plan is kept in the office of the District Collector, Salem, and may be inspected during office hours.

Why is the land being acquired?

The Highways and Minor Ports Department states that the land is needed for formation of the Edappadi Bypass Road.

Does the acquisition include any buildings or trees?

Yes. The schedule records part of a terraced building, a thatched cattle shed and palm trees on specified parcels.