primary law

G.O. (Ms.) No. 422, Withdrawal of Urban Local Body Control, 2025

The Government of Tamil Nadu, Municipal Administration and Water Supply Department, issued G.O. (Ms.) No. 422 dated 19 November 2025, notifying the withdrawal of specified lands in Thandurai, Thirumullaivoyal 2 and Paruthipattu villages from the control of Avadi City Municipal Corporation. The withdrawals took effect from publication in the Tamil Nadu Government Gazette on 19 November 2025 and are connected with granting house-site pattas under a one-time regularisation scheme.

Category
Gazette notifications
Effective
1 January 2025
Pages
9
Status
In force
Open the source document The official copy, as published. Opens in a new tab.
Source document Preview loads as you scroll

What the notifications do

G.O. (Ms.) No. 422 dated 19 November 2025 was issued by the Government of Tamil Nadu, Municipal Administration and Water Supply Department. Using the power under sub-section (2) of section 118 of the Tamil Nadu Urban Local Bodies Act, 1998, the Governor of Tamil Nadu withdrew scheduled portions of land from the control of Avadi City Municipal Corporation.

The heading links the withdrawal to granting house-site pattas under a one-time regularisation scheme. The operative provisions deal with withdrawal from municipal corporation control and do not identify individual patta recipients.

Locations covered

The notified lands are in Avadi Taluk, Thiruvallur District. The supplied schedules identify the following locations and extents:

  • No. 22 Thandurai Village, Notification No. II(2)/MAWS/1234(b-1)/2025, includes 0.01.69 hectare in Ward E, Block 61, classified as Vandipathai.
  • Thirumullaivoyal 2 Village, Notification No. II(2)/MAWS/1234(b-2)/2025, includes 0.05.54 hectare from survey number 41 and 0.08.12 hectare from survey number 55, classified as Kalam.
  • No. 25 Paruthipattu Village, Notification No. II(2)/MAWS/1234(b-3)/2025, includes 0.02.20 hectare from survey number 9/32 and 0.02.34 hectare from survey number 87/12, classified as RuthraBoomi.
  • No. 25 Paruthipattu Village, Notification No. II(2)/MAWS/1234(b-4)/2025, includes 0.02.80 hectare from survey number 80 and 0.18.42 hectare from survey number 8/2, classified as Kalam.
  • No. 22 Thandurai Village is also covered by Notification No. II(2)/MAWS/1234(b-5)/2025. The supplied text does not include its complete schedule.

Each schedule states that the extent may be a little more or less and identifies surrounding survey numbers as boundaries.

Who should check the schedules

Owners, buyers and professionals dealing with land in the listed villages should compare the relevant survey number, subdivision, classification, extent and boundaries with the Gazette schedule. The notifications change which authority controls the scheduled land, but the supplied text does not state that every property within these villages is affected.

This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.

Common questions

When did the withdrawal from Avadi City Municipal Corporation take effect?

It took effect from the date of publication in the Tamil Nadu Government Gazette, which was 19 November 2025.

Does G.O. (Ms.) No. 422 itself grant me a house-site patta?

The heading connects the notifications with granting house-site pattas under a one-time regularisation scheme. The operative text withdraws scheduled land from municipal corporation control and does not name individual patta recipients.

Is every property in Thandurai, Thirumullaivoyal 2 or Paruthipattu affected?

No such general withdrawal is stated. Only the land identified by the survey numbers, extents and boundaries in the schedules is withdrawn from Avadi City Municipal Corporation control.

Which government authority issued these notifications?

The Government of Tamil Nadu, Municipal Administration and Water Supply Department, issued the notifications under G.O. (Ms.) No. 422 dated 19 November 2025. The withdrawal was made by the Governor of Tamil Nadu.