G.O. (Ms.) No. 194, Mullai Periyar Dam New Trash Rack Arrangement, 2009
The Public Works (P1) Department issued G.O. (Ms.) No. 194 on 9 September 2009, sanctioning Rs.59,48,000 for a new trash rack in the leading channel of Periyar Lake, about 130 m upstream of the tunnel entry at Thekkady Head Sluice. The work is intended to improve the maximum and consistent drawal of water from Mullai Periyar Dam to Vaigai Dam.
What the government approved
G.O. (Ms.) No. 194 of the Public Works (P1) Department, dated 9 September 2009, accepts a proposal from the Chief Engineer, Water Resources Department, Madurai Region. It sanctions Rs.59,48,000 for a new trash rack arrangement in the leading channel of Periyar Lake.
The approved location is about 130 m upstream of the tunnel entry at Thekkady Head Sluice. The purpose is to increase and stabilise the quantity of water drawn from Mullai Periyar Dam through the irrigation tunnel to Vaigai Dam.
Why the new arrangement was proposed
The Public Works (P1) Department recorded the following operational problems with the existing trash rack at the tunnel entrance:
- The existing rack has an area of 152 square feet and uses steel members with openings spaced at 8 cm centre to centre.
- The arrangement reduces the available flow area to 132 square feet, resulting in a stated flow reduction of 13.15 per cent.
- The maximum drawal was stated to be only 2,050 cusecs even when the water level exceeded 136 feet.
- Trash sticks to the rack because of suction at the tunnel entrance.
- Cleaning requires the gates to be closed for about three hours per day, three times a week, to protect divers.
- These closures were stated to reduce average drawal by about 100 cusecs per day, amounting to 1,000 mcft per year.
Main features and intended result
The new trash rack sanctioned under G.O. (Ms.) No. 194 is to be placed where the flow velocity is described as normal. Its openings are proposed at 8 cm centre to centre, extending to a level of 145 feet and covering a water height of 44 feet.
The stated expected results are:
- Maximum water drawal through the irrigation tunnel.
- More consistent transfer of water from Periyar Dam to Vaigai Dam.
- Reduced surplus supplies to Kerala.
Funding and relevance to readers
The sanctioned expenditure is assigned to the capital outlay account for the Periyar Project. Funds were to be provided through the Revised Estimate or Final Modified Appropriation for 2009 to 2010, with inclusion in the Supplementary Estimates.
G.O. (Ms.) No. 194 concerns irrigation infrastructure and government expenditure. It does not describe a sale, transfer, classification or acquisition of private land.
This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.
Common questions
Does G.O. (Ms.) No. 194 acquire any private land?
No land acquisition is described or approved in the source text. The sanction is for installing a new trash rack in the leading channel of Periyar Lake.
How much money was sanctioned for the new trash rack?
The Public Works (P1) Department sanctioned Rs.59,48,000.
Where is the new trash rack intended to be installed?
It is intended to be installed about 130 m upstream of the tunnel entry at Thekkady Head Sluice, in the leading channel of Periyar Lake.
Does the government order confirm that the work was completed?
The source text records approval and financial sanction for the proposal. It does not state that installation was completed.