The Town and Country Planning Department, issued through the Commissioner of Town and Country Planning, provides this document checklist for applications concerning industrial buildings other than multi-storeyed buildings. It sets separate submission requirements for land inside a SIPCOT or SIDCO approved industrial layout and land outside such layouts.
What the checklist covers
The Town and Country Planning Department checklist identifies the ownership records, certificates, drawings, undertakings and clearances required for industrial building applications. Requirements depend on whether the plot is within a SIPCOT or SIDCO approved industrial layout.
Land in an approved SIPCOT or SIDCO industrial layout
Applicants for land in an approved SIPCOT or SIDCO industrial layout must submit:
- Self-attested sale deed, lease deed or power of attorney documents.
- An original encumbrance certificate covering 13 years, obtained up to a date not earlier than seven days before the application.
- Structural stability certificates in Forms A, B and C, signed by the owner, architect and structural design engineer, with seals and registration numbers.
- A Fire Service department no objection certificate.
- Forms covering structural design sufficiency, supervision and compliance with structural safety requirements.
- Drawings showing sewage treatment or evidence of underground drainage, rainwater harvesting, the site plan, building details and column design calculations.
- A copy of the SIPCOT or SIDCO approved layout.
- A no objection certificate from the agency maintaining a watercourse if a culvert is proposed across it.
- Any previously approved plan issued by DTCP for the site.
Land outside an approved industrial layout
The Town and Country Planning Department requires additional land and access records for plots outside SIPCOT or SIDCO approved industrial layouts. These include patta and adangal verification, an attested FMB or Town Survey sketch, Patta, Chitta or Town Survey Land Records in the owner's name, an original legal opinion on ownership, and details of the approach road for about 250 metres along the road abutting the site.
Other conditional requirements include:
- An undertaking where the building is within 15 metres of a water body or watercourse, confirming arrangements to prevent effluent discharge and contamination.
- A Railways no objection certificate if the site is within 30 metres of railway property.
- Civil Aviation department or Air Force clearance where required.
- A Rs.20 stamp paper undertaking describing private water supply arrangements when no local body water connection is used.
- A drainage plan for wet or dry agricultural land.
- A topographical sketch showing surrounding development within a 100 metre radius.
- Archaeological Survey of India clearance where the site is between 100 metres and 300 metres from a notified area boundary.
HACA area requirements
For a site within HACA jurisdiction, applicants must provide no objection certificates from the Principal Chief Conservator of Forests, the Chief Engineer (Agricultural Engineering), and the relevant district officer of the Geology and Mining department. District Collector inspection remarks, specific recommendations and a contour plan are also required.
This summary is generated from the source document to help you find what is relevant. The PDF above is authoritative. For advice on your own property, use LandLens One or speak to a qualified professional.
Common questions
Does this checklist apply to multi-storeyed industrial buildings?
No. The Town and Country Planning Department checklist expressly covers industrial buildings other than multi-storeyed buildings.
How recent must the encumbrance certificate be?
The original encumbrance certificate must cover 13 years and must be obtained up to a date that is not earlier than seven days before the application is submitted.
Do I need a no objection certificate for a site near railway land?
For land outside an approved SIPCOT or SIDCO industrial layout, a Railways no objection certificate is required if the site is within 30 metres of the railway property boundary.
What is required if I plan to build a culvert across a watercourse?
A no objection certificate must be obtained from the government agency responsible for maintaining the channel or watercourse.